- Name of immediate client : L&T
- Total value of work executed : Rs. 210.00 Lakhs
- Total tonnage of structural Fabrication & Erection Completed : 2840. M.T.
- Total tonnage of structural & erection Completed : 2200 M.T.
- Total Inch dia / Inch meter done of piping fab/erection done : 58,600 inch dia-Fab. 58,600inch meter erection.
- Total value of manpower supply : Rs. 70 Lakhs
- Duration of the work : 18 months.
- Description of the work done :
- Fabrication and erection of PP/PE including piping, equipment flare, and OSBL Pipe racks.
- Fabcication and erection of circular platforms at GKR, PE MEG -3, PE, MEG-2 & OSBL Pipe racks.
- Finishing work at PTA-1, GKR, PE, GKR Flare and OSBL racks.
- Piping work at Tank Form, GKr & PP / Pe Flare lines, underground piping at loading, unloading area and tank form area.
- Sprinkler system at tank form area.
- Maximum manpower employed : 400